เข้าสู่ระบบ สมัครสมาชิก

initial operational test and evaluation การใช้

ประโยคมือถือ
  • In February 1985, initial operational test and evaluation was completed on the imaging infrared guidance seeker.
  • In 1989, the system began its Initial Operational Test and Evaluation ( IOT & E ) series of tests.
  • Risk is introduced in the navy's plan to conduct integration testing of key systems at the same time as initial operational test and evaluation.
  • The Palmdale plant recently took on an additional task of modifying early-model F / A-22 aircraft slated for initial operational test and evaluation work.
  • In March 1990, the unit deployed to White Sands Missile Range, New Mexico to conduct the Initial Operational Test and Evaluation of the Army Tactical Missile System.
  • Initial Operational Test and Evaluation ( IOT & E ) for the Excalibur Ib was completed in May 2014, moving the projectile closer to full-rate production.
  • Once DT & E is accomplished, aircraft systems transition to Initial Operational Test and Evaluation, or IOT & E where the aircraft is evaluated for combat effectiveness and suitability for an intended mission.
  • The original plan to go operational in July was delayed until January 1973, in spite of a truncated testing period that combined the " Design Verification System Test " and " Initial Operational Test and Evaluation " periods.
  • On 25 June 2012, General Atomics announced that the Gray Eagle had been deployed in its first full company of 12 aircraft . Initial Operational Test and Evaluation ( IOT & E ) was completed in August 2012.
  • "DOT & E reported on APG-79 radar IOT & E [ initial operational test and evaluation ] in FY07, assessing it as not operationally effective or suitable due to significant deficiencies in tactical performance, reliability, and BIT functionality.
  • "We will ensure that all the latest upgrades are included so the DIOT & amp; E ( Dedicated Initial Operational Test and Evaluation ) fleet of jets will have a common configuration, " said Rick Baker, company vice president and Palmdale site general manager.
  • Surface warfare tracking and live fire exercises are scheduled in summer 2014, culminating in initial operational test and evaluation in 2015 . " Coronado " is the first " Independence "-class LCS to undergo firings of the 30 mm cannons of the surface warfare mission package.
  • On 1 July 2013, an initial operational test and evaluation ( IOT & E ) report found that the P-8A was " operationally effective, operationally suitable, and ready for fleet introduction . " Six test and nine low-rate initial production aircraft had been delivered at that point.
  • "Montford Point " began a series of Post-Delivery Tests and Trials ( PDT & T ) events beginning in April 2014 that took place over several months, which included an Initial Operational Test and Evaluation ( IOT & E ) end-to-end event to determine operational effectiveness and the week-long Pacific Horizon 2015 humanitarian assistance and disaster relief exercise.
  • On 28 July 2014, Lockheed successfully completed all Developmental Test / Operational Test ( DT / OT ) flight tests for the AW GMLRS . They were the first tests conducted with soldiers operating the fire control system, firing rockets at mid and long-range from a HIMARS . The Initial Operational Test and Evaluation ( IOT & E ) exercise was to be conducted in fall 2014.
  • Per initiatives and as a DT & E function, the Institute for Defense Analyses ( IDA ) and the Defense Department's Director of Operational Test and Evaluation ( DOT & E ) became involved in three development test activities, including : 1 ) reviewing initial operational test and evaluation plans; 2 ) monitoring initial operational test and evaluation; and 3 ) structuring follow-on test and evaluation activities.
  • Per initiatives and as a DT & E function, the Institute for Defense Analyses ( IDA ) and the Defense Department's Director of Operational Test and Evaluation ( DOT & E ) became involved in three development test activities, including : 1 ) reviewing initial operational test and evaluation plans; 2 ) monitoring initial operational test and evaluation; and 3 ) structuring follow-on test and evaluation activities.
  • The Cape Cod system reached Initial operating capability ( IOC ) in 1980 : " Cape Cod Missile Early Warning Station " on 4 April with initial operational test and evaluation ( IOT & E ) completed 21 May; Beale AFB IOC on 15 August . and Otis Also in 1980, the 2 PAVE PAWS, 3 BMEWS, and the PARCS & FPS-85 radar stations transferred to Strategic Air Command ( then Space Command in 1983 ).
  • In executing the Intercontinental Ballistic Missile Initial Operational Test and Evaluation and Force Development Evaluation programs, the 576th Flight Test Squadron prepares for and conducts ground and flight tests to collect, analyze, and report performance, accuracy, and reliability data for the Joint Staff, USSTRATCOM, Air Staff, and AFSPC . The 576th Flight Test Squadron identifies missile system requirements, demonstrates current and future war fighting capabilities, and validates missile system improvements and upgrades.
  • In executing the Intercontinental Ballistic Missile Initial Operational Test and Evaluation and Force Development Evaluation programs, the 576th Flight Test Squadron prepares for and conducts ground and flight tests to collect, analyze, and report performance, accuracy, and reliability data for the Joint Staff, USSTRATCOM, Air Staff, and AFGSC . The 576th Flight Test Squadron identifies missile system requirements, demonstrates current and future war fighting capabilities, and validates missile system improvements and upgrades.